The Problem
The clubhouse presented a highly complex challenge. Its size and three distinct roofing systems (shingle, TPO/PVC, and EPDM) created a complicated project. Each of the roofing systems was failing.
System failure and leaks: The diverse roof sections degraded unevenly, leading to widespread, persistent leaks. The low-slope TPO/PVC areas suffered from zero-slope conditions and poor internal drainage, causing substantial water accumulation and saturation in the insulation.
Structural and safety deficiencies: The steep-slope shingle section required a complete re-nailing. This was necessary before the reroofing process to ensure the decking met current code fastener standards. Additionally, the low-slope areas lacked proper safety and maintenance features, requiring the Lifetime Quality team to install roofing walkway boards for mechanical access.
Thermal inefficiency: The existing low-slope systems had outdated or water-compromised insulation, leading to significant thermal loss and high energy consumption. This issue needed to be corrected with new tapered ISO and fiberboard layers.